1.
Manggolo S, Antonius, Wibowo K. ANALISA PERBANDINGAN BIAYA DAN WAKTU METODE KOSTRUKSI TOP-DOWN DAN BOTTOM-UP PADA PEKERJAAN BASEMENT GEDUNG TENTREM SEMARANG. JTSA [Internet]. 2023Jul.20 [cited 2024Nov.23];28(2):95-101. Available from: https://ejournal.utp.ac.id./index.php/JTSA/article/view/2512