[1]
Manggolo, S., Antonius and Wibowo, K. 2023. ANALISA PERBANDINGAN BIAYA DAN WAKTU METODE KOSTRUKSI TOP-DOWN DAN BOTTOM-UP PADA PEKERJAAN BASEMENT GEDUNG TENTREM SEMARANG. Jurnal Teknik Sipil dan Arsitektur. 28, 2 (Jul. 2023), 95-101. DOI:https://doi.org/10.36728/jtsa.v28i2.2512.